We are about done, still have an excavator and a lowboy stuck (well parked) on the start straightaway
Thanks again for the help yesterday Shawn.
Today we dumped a load each on the 2 little jumps, to bring them up in size a little, also dumped some dirt and made back to back berms on the 2 corners that were close together (just before and just after the first jump after feature), also built a couple of large berms coming off the feature and heading to the finish line jump (both by the hole).
Moved onto the big track about 9am, gave the finish line a bunch more dirt, giving a good size landing (and larger take off face) for those that don't want to jump the whole jump. Filled in and enlarged the face of the double after the roller hill (the one before the big table), completely filled the small double down by the road (the one after the big table). Turned the double I never liked (after the big sweeper on the back straightaway-just before the final turn before the finish line jump) into a single/roller.
I really like the new track, I gave up trying to predict what people want...but I really think it will get MUCH more action than our big track.
This thread is worthless without pics
LOL Ed, that's why the good lord gave you those 2 colored things on the front of your noggin...so you can come see it in person.
Seriously, once the lowboy and excavator are out of the way, I will snap a few.